img2015.jpg

In 2015, newly installed capacity reached 435MW

2015/11/25

After Shanghai Donghai Bridge 100MW Offshore Wind Farm demonstration project has smoothly passed 5 years warranty period, Sionvel gained the contract to continue to provide O&M service for this project. This project has become the only domestic offshore wind power project which passed 5 years of operation tests and warranty period.

img2014.jpg

In 2014, newly installed capacity reached 729MW

The cumulative offshore generating capacity for Sinovel turbines reached 170MW, making it No. 1 in the Chinese market with a total of 25.84% market share.
In 2014, Sinovel completed the design and research for 10MW-level ultra-large accelerated speed offshore wind turbines, backed by the MOST "863 Program."In addition, Sinovel has continued to implement the MOST"863 Program" project on the development and application of dedicated equipment for offshore site construction.

img2013.jpg

In 2013, newly installed capacity reached 1,040MW

Sinovel's international business development made steady progress, with a cumulative 300MW of installed capacity across a variety of regional markets, including Turkey, Italy, Sweden, Brazil and South Africa. Sinovel developed key technology for turbines in low-wind sites through the "863 Program" initiated by China's Ministry of Science & Technology (MOST).

img2012.jpg

In 2012, newly installed capacity reached 1,380MW

2012/1/19

On January 19, TüV-SüD issued CE & EMC certificates for the SL1500 and SL3000 series of turbines, affirming that the design, fabrication and performance of the two models are in full compliance with the EU's safety regulations.

2012/8/27

On August 27, China's first 5MW offshore wind turbine, which was installed during Phase II of the Shanghai Donghai Bridge Offshore Wind Farm, passed its 240-hour pre-acceptance test.

2012/10/15

On October 15, Intertek issued ETL certificates for the SL1500 and SL3000 series of turbines, affirming that the design, fabrication and performance of the two models are in full compliance with US and Canadian safety regulations.

img2011.jpg

In 2011, newly installed capacity reached 2,945MW,Sinovel's cumulative installed capacity reached 12,989MW, making it No. 1 in China.

2011/1/13

On January 13, Sinovel Wind Group Co., Ltd. successfully listed on the A-Share Main Board of the Shanghai Stock Exchange. (Stock Code: 601558)

2011/5

In May 2011, Sinovel unveiled its groundbreaking 6MW wind turbine, the largest unit capacity in China.

2011/9/6

On September 6, Sinovel successfully installed China's first 5MW offshore wind turbine.

2011/10/8

On October 8, Sinovel successfully installed China's first 6MW wind turbine prototype at Lingang Industrial Base in Sheyang, Jiangsu Province.

2011/12

In December, 19 sets of Sinovel's 3MW wind turbines were connected to the grid at the Jiangsu Rudong Wind Farm developed by China Longyuan Power Group – the first intertidal wind farm project in the world.

img2010.jpg

In 2010, newly installed capacity reached 4,386MW

2010/2/27

On February 27, 2010, Sinovel successfully completed the installation of 34 units of 3MW offshore wind turbines for the 100MW Shanghai Donghai Bridge Offshore Wind Farm project. On June 8, all the turbines were connected to the grid and put into operation.

2010/10/12

On October 12, 2010, Sinovel launched China's first 5MW wind turbine.

img2009.jpg

In 2009, newly installed capacity reached 3,510MW

2009/3/20

On March 20, 2009, Sinovel successfully completed the installation of China's first 3MW offshore wind turbine.

img2008.jpg

In 2008, newly installed capacity reached 1,403MW

2008/12

In December 2008, Sinovel launched China's first 3MW offshore wind turbine.

img2007.jpg

In 2007, Sinovel manufactured a total of five hundred 1.5MW wind turbines

2007/4

In April 2007, 13 wind turbines were preselected for a trial run at China's first localized MW-level wind farm – the HuangengWeihai Phase I project.

img2006.jpg

In 2006, Sinovel manufactured a total of one hundred 1.5MW wind turbines.

2006/6

In June 2006, Sinovel launched China's first localized 1.5MW wind turbine.

2006/9

In September 2006, the first 1.5MW wind turbine was connected to the grid and put into operation.